Municipal source reviewed October 11, 2026. General published rule verified; no parcel-specific approval.
What the current municipal source says
Residential front yards are generally 1.5 m, but 1.0 m on subdivision lots. Interior-side/rear yards are 2.0 m; exterior side yards are 1.5 m; sight triangles have a 1.0 m restriction.
Confirm subdivision status, corner geometry and any privacy-screen or pool enclosure rules. This is guidance, not a permit or survey.
Can I build a fence in Caledon?
Municipal fence, zoning and pool rules may overlap. Current municipal source material has been located; this summary does not certify the proposed fence or replace a property-specific municipal check.
Visit Caledon municipal website โCheck the correct property situation
For Caledon, first identify whether the proposed fence is in a front, rear, interior-side or street-side yard. Corner lots, driveway sightlines, sloped land, retaining walls and easements can change the measurement rule. Find your lot survey and municipal zoning category rather than relying on a neighbouring address.
Pool and boundary fencing
Pool barriers may have their own minimum enclosure requirements, gate rules and construction details. A fence on a shared boundary can also raise ownership and cost questions; the exact municipal bylaw and any applicable provincial dispute procedure are separate from the question of who owns the land.
What to ask Caledon before installation
- Which fence or zoning bylaw and section applies to this property and yard?
- Is height measured from finished grade, natural grade, top of a retaining wall or another datum?
- Is a permit required for an ordinary fence, a swimming-pool barrier or a retaining structure?
- Does a corner sightline, drainage easement, heritage district or strata rule restrict placement?
- Does the boundary need to be located by a surveyor before construction?
Official sources
Official municipal source checked October 11, 2026. Published general rule confirmed. Property-specific zoning, pool, corner and permit checks still apply.